UP date!

At a fan’s !! request a picture of the  rudder assembly.DSC01628

DSC01629DSC01616The hull, mast, boom and gaff have had their final coat of varnish!

Next: prepare the cradle for when the boat is turned and I can get started on the deck,etc.

Wooden blocks and Working on the ‘Round’ Timber!

In between the varnishing layers of the hull, the boom, mast and gaff also received there final Epoxy layer.  The mast cap was fitted as well!

DSC01474 DSC01475 DSC01476

DSC01470

reducing the diameter of the mast to fit the mast cap

 

DSC01472

The blocks have been varnished and are awaiting the fitting of the sheaves

DSC01477

Ok, I want (traditional) wooden sheave blocks. Worked out I will need 6 single sheave and 2 double sheave blocks.

If I were to order them that would set me back (about) $950!! So long live the inet !

DSC01464 homemade blocks 2

I found some plans to make my own: sheaves (the pulley wheels ;o)) $30, brass for straps $60. Axle covers Honk Kong1c and 5c pieces!!   PS Brass strips ended up costing me less then $20 for the lot