The keel requires  a 85 kg cast iron ballast component.

Instead a 85+ Kg lead keel  was cast

OLYMPUS DIGITAL CAMERA

the burner was surrounded with bricks to retain the heat

OLYMPUS DIGITAL CAMERA

tilting the container the molten lead was poured into the mold in one go

OLYMPUS DIGITAL CAMERA

cast removed

the cast was removed voila!  the lead keel in its place!

Keel with sacrificial part

sacrificial keel attached